Hustle HQ - Customer Portal (Proposals)

HUSTLEBUILT

Built to Scale. Built for Hustlers.

Preliminary Client Proposal – Subject to Vendor Confirmation

LYDIA Carryout – Complete Brand Investment Proposal

A premium storefront signage upgrade designed to increase street presence, strengthen customer confidence, and create 24/7 visibility. Installation is included in the signage investment options below.

Visual Impact – Daytime Presence

Matte black cabinet with crisp, high-contrast channel letters for strong street visibility.
DAY
PLACEHOLDER IMAGE: Lydia Day Render
(Replace with your approved daytime mockup)

Nighttime Impact – Illuminated Visibility

Lighting ensures your storefront stays visible when competitors fade into darkness.
NIGHT
)

“Illuminated signage works 24/7 as a silent salesperson, turning attention into foot traffic.”

Signage Investment Options

Option Investment
Option 1 – Value Build
Matte black cabinet wrap, clean channel letters, balanced daytime presence. Installation included.
  • Turnkey install included (install value: $900)
  • Standard LED modules (if applicable)
  • Standard aluminum channel fabrication
$3,395
Option 2 – Full Illuminated (Most Popular) ★ RECOMMENDED
Strong day + night presence with premium look. Best balance of impact and competitive investment. Installation included.
  • Matte black cabinet wrap
  • Illuminated primary signage for 24/7 visibility
  • Turnkey install included (install value: $900)
$3,695
Option 3 – Premium Finish
Enhanced materials/finish upgrades + premium presence. Installation included.
  • Upgraded finishes & premium fabrication details
  • High-output lighting enhancements (where applicable)
  • Priority scheduling (subject to vendor confirmation)
$3,995
Important: This proposal reflects preliminary pricing based on estimated dimensions, scope, and current market fabrication rates. Final pricing is subject to vendor confirmation, field measurement, engineering review, and municipal permit requirements. Any scope modifications will be approved in writing prior to production.

Permitting & Compliance

Municipal Compliance Service (Optional)

Exterior signage requires municipal approval before installation. Clients may handle permitting independently or authorize HustleBuilt to manage the process end-to-end.

$650
  • Permit application preparation & submission
  • Municipal follow-up and compliance documentation
  • Inspection scheduling coordination (as required)
  • Note: City permit fees are billed separately at cost

If permitting is not authorized through HustleBuilt, installation will be scheduled only after the client provides proof of approved permits.

Business Starter Bundles (Upsell)

Starter Bundle

Save $125
$599
  • 3 embroidered aprons
  • 3 baseball caps
  • 1 A-frame sidewalk sign
  • 2 small window decals
  • 250 business cards

Professional Bundle

Save $325
$1,299
  • 5 premium embroidered aprons
  • 5 structured baseball caps
  • 1 double-sided A-frame
  • 4 large window graphics
  • 500 business cards
  • 500 loyalty punch cards
  • 2 menu boards

Premium Bundle

Save $650
$2,499
  • 8 deluxe custom aprons
  • 8 premium caps / beanies
  • 1 heavy-duty A-frame
  • Full window wrap
  • 1,000 business cards
  • 1,000 loyalty cards
  • 4 menu boards
  • 5 branded T-shirts

Merch-Only Bundle

Save $175
$899
  • 6 embroidered aprons
  • 6 baseball caps
  • 6 branded T-shirts
  • 3 winter beanies
  • 6 name tags
Bundle Strategy: These bundles complete the customer experience and make the storefront investment work harder—immediately improving brand trust, in-store consistency, and repeat orders.

Return on Visibility

Revenue Impact Calculator

Illuminated signage works 24/7 as a silent salesperson—capturing attention and converting foot traffic when others disappear at night.

$502 additional orders/day × $25
$1,500Estimated monthly impact
$18,000Estimated annual impact
~76 DaysEstimated payback period

Project Timeline

Estimated Duration: 4–6 Weeks

Timeline may vary based on vendor lead time, engineering requirements, and permit processing.

1
Design ApprovalWeek 1
2
Permits FiledWeek 2–3 (upon compliance authorization or client proof of permit)
3
FabricationWeek 4–5
4
InstallationWeek 6

Payment Terms & Approval

Payment Terms

  • 60% deposit due at approval (initiates design & scheduling)
  • 30% due once fabrication begins (production checkpoint)
  • 10% due prior to installation (final activation)
Permitting Note: Installation cannot be scheduled until permits are approved. If permitting is not authorized through HustleBuilt, client must provide proof of permit approval prior to installation scheduling.

Client Approval